top of page
Background

Cut Wax, Not Production: Optimise Operations with PACE24


  • peregrinex547
  • May 6
  • 1 min read

Wax build-up can choke production and inflate OPEX — but shutting in wells for wax cutting comes at a cost too.

With PACE24 by Peregrine X, operators can now:✔️ Analyse samples before and after wax cutting✔️ Determine the optimal scheduling for wax removal✔️ Minimise downtime and production deferment✔️ Reduce slickline equipment usage and costs

Smarter scheduling means keeping wells flowing longer, cutting unnecessary interventions, and protecting production performance.

Optimised operations = maximised returns.

Discover how PACE24 can transform your wax cutting strategy → www.peregrine-x.com/pace24

 
 
 

Comments


bottom of page